
Add to Cart
PU Sandwich Panel Freezer Storage Warehouse / OEM Walk In Freezer Room
Freezer Storage Warehouse Application sites:
Food processing factory, fish processing factory, cargo distribution center, Large super market distribution center, Logistics and Transfer center etc
Freezer Storage Warehouse Specification:
Temperature specification
Cold storage function | Designed temperature range | |
°C | °F | |
Fresh keeping e.g. fruit, vegetable, eggs, milk | 0 ~ + 5 | |
Processing area e.g. processing, corridor, loading, | +2~+8 | +35.6~+46.2 |
PU sandwich panel thickness:
cold room temperature | panel thickness(mm) |
+10~0 degree | 50-75 |
0~-10 degree | 100 |
-10~-18 degree | 150 |
-18 degree below | 200 |
Why choose us
· 20+ years of field experts, 15+ years of engineer
· Many years of exporting and oversea project experience
· Life-long free online technical support service
· Fast construction
· Ecool cold storage are custom design project, customers could tell us your requirements and we will suppliy you a turn-key project.
· Cold storage temperature range is large: -40º C ~ + 10C are available, user could adjust room temperature within designed range.
· Functions: all procedures which need refrigeration in meat processing are included e.g. blast freezing, frozen food storage
· We provide Intelligent remote-control model is available, for your convivence of remote control and getting remote technical support
· Our refrigeration machine are featured high reliability, good performance and low noise.Muilti-compressor unit could save energy up to 30%
Procedures of purchasing custom cold storage
Step | Contents | Details |
1 | Client describe the requests and using methods | 1. Client provides some basic requirements; |
2. Client provides relative information: | ||
1) construction address, environment, weather, geology conditions, electricity supply; | ||
2) storage purpose and functions; | ||
Other design requirements | ||
2 | We offer sketch design and pric | 1. Communication on details, discussion and modification until reach an agreement; |
2. sketch design; | ||
3. price offer on all systems | ||
3 | Contract and formal design | 1. Sigh the former design contract (if any); |
2. Site survey and measurement (if necessary); | ||
3. Formal design and delivery; | ||
4. Details of solution and price. | ||
5. Client prepare the construction site and foundation. | ||
4 | Equipment and material export | 1. Sign the contract of equipment and materials; |
2. production and export preparation | ||
3. Client prepare the on-site electricity and water | ||
5 | Installation | 1. working procedure confirm and team organization; |
2. Construction teams go to install. | ||
6 | Check and acceptance | 1. Our technicians trial run the cold storage on-site; |
2. Client check and make acceptance. | ||
7 | Operation instruction and warranty | 1. training clients’ cold storage operators; |
2. provide technical support within the lifetime of cold storage. |